Editing STS FAQ

Jump to navigation Jump to search

Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.

The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.

Latest revision Your text
Line 8: Line 8:
  
 
It refers to the throttle setting. Nominal thottle setting is 104.5%, but the Block II SSMEs can go all the way up 109% if needed. So '''Single engine 104''' means that nominal MECO targets with a single engine running at 104.5% nominal thottle setting.
 
It refers to the throttle setting. Nominal thottle setting is 104.5%, but the Block II SSMEs can go all the way up 109% if needed. So '''Single engine 104''' means that nominal MECO targets with a single engine running at 104.5% nominal thottle setting.
====How do you control the main engines?====
 
 
The nominal operation mode is fully automatic, controlled by the GPCs. But the speedbrake/throttle controllers allow manual take over in emergency. This operation requires pressing a button on the controller and move the throttle controller to the current automatic power setting and release the take-over button. If you have moved the controller to the right setting (For example, 104%), indicators on the forward panel light and indicate that you now have manual control.
 
 
Additionally, there are a number of switches and pushbuttons to manually cut off the SSMEs and manage the main propulsion system, for example power-down the controllers or manually initiate propellant dump and inert sequences after MECO.
 
  
 
==Aborts and emergencies==
 
==Aborts and emergencies==
Line 21: Line 16:
  
 
This can only be done while in controlled flight and at subsonic speeds, while the orbiter is still capable of gliding. The procedure can of course be done under control of the autopilot.
 
This can only be done while in controlled flight and at subsonic speeds, while the orbiter is still capable of gliding. The procedure can of course be done under control of the autopilot.
 
Columbia had two ejection seats in its initial test flights, but they had been disabled from STS-5 on and removed before STS-61-C.
 
 
===What is the "Green Apple" and why should an astronaut pull it in emergency?===
 
 
"GREEN APPLE - PULL" is a common line in Shuttle Checklists, but what is the green apple?
 
 
The "Green Apple" is a tiny green ball connected to the pressure suit with a cord. When the astronaut pulls on the cord, he activates the emergency O2 supply of his suit by opening the valve connected to the cord.
 
  
 
==Payloads==
 
==Payloads==
Line 36: Line 23:
 
STS Payload Bay has a diameter of 4.6 m and a length of 18.2 m. For [[ISS]] missions, however some of the space is taken up the [[Orbiter Docking System]] so the available free length of the PLB is approx. 16.25 m.
 
STS Payload Bay has a diameter of 4.6 m and a length of 18.2 m. For [[ISS]] missions, however some of the space is taken up the [[Orbiter Docking System]] so the available free length of the PLB is approx. 16.25 m.
  
Maximum payload mass depends on orbiter vehicle and orbit needed for the payload. It can take more into a 300x300x28.5° orbit than a 400x400x51.6° orbit.
+
Maximum payload mass depends on orbiter vehicle and orbit needed for the payload. It can take more into a 300x300x28.5° orbit than 400x400x51.6° orbit.
 
 
As a space plane, the payload, which can be returned (download) to [[Earth]], is also limited by [[cross range]]  and [[Center of gravity|CoG]] requirements.
 
 
 
==Subsystems==
 
===APU===
 
====What are the APUs and why are they needed?====
 
The orbiter has three independent hydraulic systems. Each consists of a main hydraulic pump, hydraulic reservoir, hydraulic bootstrap
 
accumulator, hydraulic filters, control valves, hydraulic/Freon heat exchanger, electrical circulation pump, and electrical heaters.
 
 
 
Each system provides hydraulic pressure to position hydraulic actuators for:
 
#Thrust vector control of the main engines by gimbaling the three SSMEs
 
#Actuation of various control valves on the SSMEs
 
#Movement of the orbiter aerosurfaces (elevons, body flap, rudder/speed brake)
 
#Retraction of the external tank/orbiter 17-inch liquid oxygen and liquid hydrogen disconnect umbilicals within the orbiter at external tank jettison
 
#Main/nose landing gear deployment (system 1)/(system 1 or 2)
 
#Main landing gear brakes and anti-skid
 
#Nose wheel steering (system 1 with backup from system 2).
 
 
 
Each hydraulic system is capable of operation when exposed to forces or conditions caused by acceleration, deceleration, normal gravity, zero gravity, hard vacuum, and temperatures encountered during on-orbit dormant conditions.
 
 
 
Three identical, but independent, improved auxiliary power units (APUs; also called IAPUs) provide power for the orbiter hydraulic
 
systems. The APU is a hydrazine-fueled, turbine-driven power unit that generates mechanical shaft power to drive a hydraulic pump that produces pressure for the orbiter’s hydraulic system. Each unit weighs approximately 88 pounds and produces 135 horsepower.
 
 
 
The three APUs and fuel systems are located in the aft fuselage. Each APU fuel system supplies storable liquid hydrazine fuel to its respective fuel pump, gas generator valve module, and gas generator, which decomposes the fuel through catalytic action. The resultant hot gas drives a single-stage, dual pass turbine. The turbine exhaust flow returns over the exterior of the gas
 
generator, cooling it, and is then directed overboard through an exhaust duct at the upper portion of the aft fuselage near the vertical stabilizer.
 
 
 
====What does a APU consist of?====
 
Each APU consists of a fuel tank, a fuel feed system, a system controller, an exhaust duct, lube oil cooling system, and fuel/lube oil vents and drains. Redundant electrical heater systems and insulation thermally control the system above 45° F to prevent fuel from freezing and to maintain required lubricating oil viscosity. Insulation is used on components containing hydrazine, lube oil, or water to minimize electrical heater power requirements and to keep high surface temperatures within safe limits on the turbine and exhaust ducts.
 
 
 
====Why do the APU's operation create smoke puff?====
 
The vapor clouds are coming from the ''Water Spray Boilers'' (WSB) that are used to cool the lube oil of the APU turbines by spraying a small bit of water on the heat exchanger lines. The water vaporizes and the overpressure gets vented to the outside. The turbine exhaust of each APU on the other hand is invisible.
 
 
 
The lube oil of each APU is circulated through a heat exchanger in a corresponding water spray boiler. Three water spray boilers (WSBs), one for each APU, cool the lube oil systems. The hydraulic fluid of each hydraulic pump driven by an APU is also circulated through a hydraulic heat exchanger in the corresponding water spray boiler to cool hydraulic fluid during hydraulic system operation. The three WSBs are also located in the aft fuselage of the orbiter.
 
  
====Are they active on orbit as well?====
+
As a spaceplane, the payload, which can be returned (download) to [[Earth]], is also limited by [[cross range]]  and [[Center of gravity|CoG]] requirements.  
No. Shut down shortly after MECO and aren't used again until the standard Landing-1 day aerosurface checkout.  
 
  
====What fuel is used for powering the APUs?====
+
==Guidance, Navigation and Control==
They're monopropellant which means they only use one propellant which in this case is hydrazine.
 
  
===Guidance, Navigation and Control===
+
===How is the Space Shuttle controlled in real life?===
====How is the Space Shuttle controlled in real life?====
+
The orbiter is usually controlled automatically by the [[GPC|GPCs]] except during landing and some orbit maneuvers (eg docking). Manual control is possible by using [[Rotary hand controller|Rotary hand controllers]] and [[Translation hand controller|Translation hand controllers]], which can be used in many different operation modes.
The orbiter is usually controlled automatically by the [[GPC|GPCs]] except during landing and some orbit maneuvers (eg docking). Manual control is possible by using [[Rotary hand controller|rotary hand controllers]] and [[Translation hand controller|translation hand controllers]], which can be used in many different operation modes.
 
  
  
===Communications===
+
==Communications==
  
====What is the purpose of the Ku-Band antenna?====
+
===What is the purpose of the Ku-Band antenna?===
  
 
The Ku-Band antenna gets used for:
 
The Ku-Band antenna gets used for:
Line 91: Line 42:
 
*As [[rendezvous]] [[radar]] for tracking the rendezvous target.
 
*As [[rendezvous]] [[radar]] for tracking the rendezvous target.
  
===Payload Deployment and Retrieval System (PDRS)===
+
==Payload Deployment and Retrieval System (PDRS)==
  
====What is the PDRS?====
+
===What is the PDRS?===
  
 
The PDRS is used to maneuver itself or an attached [[payload]] in [[orbit]]. It consists of the
 
The PDRS is used to maneuver itself or an attached [[payload]] in [[orbit]]. It consists of the
Line 111: Line 62:
 
*deploy and retrieve operations.
 
*deploy and retrieve operations.
  
====How does the PDRS get controlled?====
+
===How does the PDRS get controlled?===
  
 
All RMS operations involve a two-person operator team. Each member is vital to the success of the mission. The PDRS controls are located primarily on panels A8L, MA73C, and A8U. Other panels that affect the RMS are ML86B, A14, A7U, A6, and R13. The major PDRS CRT display is SPEC 94 PDRS CONTROL. PDRS OVERRIDE SPEC 95, PDRS STATUS DISP 169, and PDRS FAULTS SPEC 96 also control and monitor the RMS. DISP 97 PL RETENTION monitors payload retention device status.
 
All RMS operations involve a two-person operator team. Each member is vital to the success of the mission. The PDRS controls are located primarily on panels A8L, MA73C, and A8U. Other panels that affect the RMS are ML86B, A14, A7U, A6, and R13. The major PDRS CRT display is SPEC 94 PDRS CONTROL. PDRS OVERRIDE SPEC 95, PDRS STATUS DISP 169, and PDRS FAULTS SPEC 96 also control and monitor the RMS. DISP 97 PL RETENTION monitors payload retention device status.
Line 121: Line 72:
 
*auto modes.
 
*auto modes.
  
====How is the RMS arm stored in the cargo bay while launch and reentry?====
+
===How is the RMS arm stored in the cargo bay while launch and reentry?===
  
 
The [[Remote Manipulator System|RMS]] arm is held in place by a set of ''Mechanic Retention Latches''(MRL) of the ''Manipulator Positioning Mechanism'' (MPM).
 
The [[Remote Manipulator System|RMS]] arm is held in place by a set of ''Mechanic Retention Latches''(MRL) of the ''Manipulator Positioning Mechanism'' (MPM).
  
===Thermal protection system (TPS)===
+
==Thermal protection system (TPS)==
  
====If there will be a damaged heat shield how will the crew change it?====
+
===If there will be a damaged heat shield how will the crew change it?===
  
 
Currently, there's no no way to repair the orbiter's [[heat shield]] or [[thermal protection system]]. The TPS consists of both thermal blankets, silica tiles and [[reinforced carbon carbon]](RCC) nosecap and wing leading edge panels.
 
Currently, there's no no way to repair the orbiter's [[heat shield]] or [[thermal protection system]]. The TPS consists of both thermal blankets, silica tiles and [[reinforced carbon carbon]](RCC) nosecap and wing leading edge panels.
  
====How is a damaged Thermal Protection System detected?====
+
===How is a damaged Thermal Protection System detected?===
 
During launch and ascent, there's a whole bunch of ground tracking cameras and radars that observes the space shuttle for any debris events. There's even a set of seven cameras on the shuttle itself!
 
During launch and ascent, there's a whole bunch of ground tracking cameras and radars that observes the space shuttle for any debris events. There's even a set of seven cameras on the shuttle itself!
  
Line 141: Line 92:
  
 
Also during rendezvous with the [[International Space Station]], the orbiter will do a 360° pitch-around manuever that will allow the ISS crew to photograph the TPS that will later be downlinked to the ground.
 
Also during rendezvous with the [[International Space Station]], the orbiter will do a 360° pitch-around manuever that will allow the ISS crew to photograph the TPS that will later be downlinked to the ground.
 
[[Category: Articles]]
 
[[Category: Tutorials]]
 

Please note that all contributions to OrbiterWiki are considered to be released under the GNU Free Documentation License 1.2 (see OrbiterWiki:Copyrights for details). If you do not want your writing to be edited mercilessly and redistributed at will, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource. Do not submit copyrighted work without permission!

To protect the wiki against automated edit spam, we kindly ask you to solve the following hCaptcha:

Cancel Editing help (opens in new window)